Final_Project
#17380
TA/JUR.TE.PS.T.LISTRIK 034 DES p 2023 ISBN:20612033

Subjects:TEKNIK ELEKTRO Penelitian

    PERENCANAAN INSTALASI PENERANGAN JALAN UMUM PADA JALAN SIMPANG PASIR KECAMATAN PALARAN KOTA SAMARINDA --

    DESEL JANSEN SEMULANG / / /
    Samarinda 2023
    xiv;57 h; ilus ; 29 cm Bahasa:Ind

    ABSTARAK
    Desel Jansen Semulang Pembimbing
    20612033 Toyib, S.T., M.T.
    Program Studi Teknik Listrik D-III Subir, S.T., M.T.
    Perencanaan Instalasi Penerangan Jalan Umum Pada Jalan Simpang Pasir
    Kecamatan Palaran Kota Samarinda
    Perkembangan teknologi kelisrikan saat ini sangatlah pesat sejalan dengan
    perkembangan teknologi peralatan pendukung manusia. Kebutuhan energi listrik
    terus meningkat sesuai dengan laju pertumbuhan ekonomi dan industri serta
    pertumbuhuhan penduduk. Jalan Simpang Pasir Kecamatan Palaran Kota
    Samarinda ini terhubung dengan jalan Tol Samarinda-Balikpapan dan Jalan Stadion
    Utama Kaltim, sementara pada jalan ini merupakan salah satu akses bagi truk
    kontainer dan pengendara mobil untuk menuju jalan Tol Samarinda-Balikpapan
    ataupun pengendara motor menuju perumahan sekitar, mengingat kondisi disekitar
    jalan yang masih minim penerangan sehingga untuk mengoptimalkan penerangan
    pada jalan ini perlu perencanaan penerangan. Pada Jalan Simpang Pasir memiliki
    panjang jalan 4,400 meter dan lebar jalan 7 meter. Jenis tiang lampu yang
    digunakan adalah tiang lampu jenis oktagonal lengan tunggal dengan tinggi 11
    meter, panjang stang ornamennya 2,8 meter dengan sudut kemiringan 8.10°
    dipasang dikanan jalan secara sejajar dengan jarak 40 meter sebanyak 111 tiang.
    Lampu yang digunakan adalah lampu LED 70 watt. Sistem kontrol pada
    perencanaan jalan ini menggunakan sistem otomatis dan manual yang di kontrol
    dengan LDR, kontaktor, dan selector. Tujuan dipasang selector ini agar rangkaian
    tetap dapat di operasikan jika LDR rusak atau tidak mau berfungsi dan
    mempermudahkan dalam pihak terkait untuk melakukan perawatan ataupun
    pemeliharaan pada lampu jalan.
    Kata kunci : Lampu LED, Jenis tiang lampu, Sistem otomatis manual

    ABSTRACT
    Desel Jansen Semulang Supervisor
    20612033 Toyib, S.T., M.T.
    Electrical Engineering Diploma-III Study Program Subir, S.T., M.T.
    Planning of Public Street Lighting Installation on Simpang Pasir Road,
    Palaran Sub-district, Samarinda City.
    The development of lighting technology is currently advancing rapidly, in line with
    the progress of human-supporting equipment technology. The demand for electrical
    energy continues to increase in accordance with the growth of the economy,
    industry, and population. Simpang Pasir Road in Palaran Sub-district, Samarinda
    City, is connected to the Samarinda-Balikpapan Toll Road and the Kaltim Main
    Stadium Road. This road serves as one of the access routes for container trucks and
    car drivers heading to the Samarinda-Balikpapan Toll Road, as well as for
    motorcyclists heading to surrounding residential areas. However, the area around
    this road still lacks sufficient street lighting. To optimize the lighting on this road,
    proper lighting planning is necessary. Simpang Pasir Road has a length of 4,400
    meters and a width of 7 meters. The type of lamp post used is a single-arm octagonal
    lamp post with a height of 11 meters, an ornament pole length of 2.8 meters, and
    an inclination angle of 8.10°. These lamp posts are installed on the right side of the
    road in parallel, with a distance of 40 meters between each post, totaling 111 lamp
    posts. The lights used are 70-watt LED lights. The lighting control system for this
    road planning uses both automatic and manual systems, controlled by a Light-
    Dependent Resistor (LDR), contactor, and selector. The purpose of installing the
    selector is to ensure that the circuit can still be operated if the LDR is damaged or
    not functioning, and it facilitates maintenance and repairs for the street lights