#15648
TA/JUR.T.ELEKTRO.PS.TEKNIK LISTRIK 039 BAG s 2022 ISBN:19612019
Subjects:TEKNIK ELEKTRO Penelitian
STUDI INSTALASI LISTRIK MOTOR POMPA PERUSAHAAN DAERAH AIR MINUM TIRTA MAHAKAM CABANG LOA JANAN KABUPATEN KUTAI KARTANEGARA --
BAGOES CATUR APRIANANDA / / /Samarinda 2022
xviii; 134 h; ilus; 29 cm Bahasa:Ind
ABSTRAK
Bagoes Catur Apriananda, 2022, Studi Instalasi Listrik Motor Pompa
PDAM Tirta Mahakam Cabang Loa Janan Kabupaten Kutai Kartanegara,
(dibimbing oleh Bapak Suratno, ST., MT sebagai pembimbing satu dan Bapak Ir.
M. Syahrir Djalil, MT sebagai pembimbing dua).
Kualitas air bersih yang baik dihasilkan melalui beberapa tahapan
pengolah dimulai dari intake hingga reservoir, maka diperlukan peralatan listrik
dan sistem kelistrikan guna mempermudah proses pengolahan air bersih. Pada unit
intake dan Instalasi pengolahan air (IPA) masing masing memiliki sistem instalasi
listrik, dimana unit intake memiliki beban motor penggerak pompa dengan satu
unit berkapasitas daya terbesar 75 kW, dan dua unit berkapasitas 55 kW dengan
sistem starting kontrol konvensional. Sedangkan pada unit dan IPA memiliki
beban motor induksi penggerak pompa distribusi sebanyak enam unit, motor
penggerak pompa dosing sebanyak empat unit, dan motor penggerak pompa mixer
sebanyak empat unit dengan sistem starting kombinasi inverter dan kontrol
konvensional. Pengaman pada motor pompa dosing dan motor mixer di lapangan
berjenis MCB tiga kutub sebesar 9 A dan hasil penghitungan sebesar 2,7 A untuk
pengaman motor pompa dosing dan 5,75 A untuk pengaman motor mixer. Luas
penampang penghantar yang digunakan pada motor pompa intake 1 dan 2
dilapangan sebesar 4 x 35mm2 dengan jenis kabel NYY dan hasil penghitungan
mendapatkan KHA sebesar 127,5 A dengan luas penampang sebesar 4 x 35 mm2.
Semakin besar pengaman motor yang digunakan maka sebaiknya menggunakan
luas penampang penghantar yang lebih besar.
Kata kunci : proses pengolahan air, motor induksi, kontrol konvensional.
ABSTRACT
Bagoes Catur Apriananda, 2022, Study on Electric Pump Motor
Installation of PDAM Tirta Mahakam Loa Janan Branch, Kutai Kartanegara
Regency, (supervised by Mr. Suratno, ST., MT as supervisor one and Mr. Ir. M.
Syahrir Djalil, MT as supervisor two).
Good quality clean water is produced through several processing stages
starting from the intake to the reservoir, so electrical equipment and electrical
systems are needed to facilitate the clean water treatment process. The intake unit
and the water treatment plant (IPA) each have an electrical installation system,
where the intake unit has a pump drive motor load with one unit with the largest
power capacity of 75 kW, and two units with a capacity of 55 kW with a
conventional starting control system. While the units and IPA have a load of six
units of induction motor driving the distribution pump, four units of dosing pump
driving motor, and four units of mixer pump driving motor with a combination
starting system of inverter and conventional control. The safety of the dosing
pump motor and mixer motor in the field is of the three-pole MCB of 9 A and the
calculation results are 2,7 A for the safety of the dosing pump motor and 5,75 A
for the safety of the mixer motor. The cross-sectional area of the conductor used
in the intake pump motors 1 and 2 in the field is 4 x 35mm2 with NYY cable type
and the calculation results get a KHA of 127,5 A with a cross-sectional area of 4 x
35 mm2. The greater the safety motor used, the better to use a larger cross-
sectional area of the conductor.
Keywords: water treatment process, induction motor, conventional control.