    STUDI INSTALASI LISTRIK KANTOR RUMAH PENYIMPANAN BENDA SITAAN NEGARA KOTA SAMARINDA --

    MUHAMMAD RAIHAN DEVGAN TAMIANA / / /
    Samarinda 2022
    xix; 139 h; ilus; 29 cm Bahasa:Ind

    ABSTRAK
    Muhammad Raihan Devgan Tamiana Pembimbing
    19612009 I. Ir. H. M. Syahrir Djalil, M.T.
    Program Studi Teknik Listrik D-III II. H. Abdul Rahman, LC., M.Fil.l.
    STUDI INSTALASI LISTRIK KANTOR RUMAH PENYIMPANAN
    BENDA SITAAN NEGARA KOTA SAMARINDA
    Sampai saat ini masih banyak terdapat kekurangan dalam memperhatikan ketelitian
    dalam pemasangan instalasi penerangan salah satunya pada Kantor RUPBASAN.
    Pada kantor rupbasan memiliki beberapa misi salah satunya seperti menyimpan
    benda-benda yang disita oleh negara agar terjamin baik dan aman, memberikan
    pelayanan yang baik dan nyaman terhadap tamu ataupun karyawan yang bekerja
    didalamnya, dan dengan demikian kebutuhan akan instalasi listrik yang baik
    penting untuk menunjang kelancaran kegiatan yang dilakukan didalam kantor
    rupbasan. Bangunan ini terletak di Jalan P. Suryanata No. 17, Bukit Pinang,
    Kecamatan Samarinda Ulu, Kota Samarinda, Kalimantan Timur. Untuk data
    lapangan jumlah titik lampu keseluruhan berjumlah 88 titik lampu, sedangkan dari
    hasil perhitungan jumlah titik lampu keseluruhan berjumlah 131 titik lampu. Jadi
    selisih jumlah titik lampu berdasarkan hasil perbandingan sebanyak 43 titik lampu.
    Hasil perhitungan daya keseluruhan pada kantor rupbasan sebesar 11637 watt,
    sedangkan daya keseluruhan yang terpasang di lapangan sebesar 10723 watt. Hasil
    penghitungan kapasitas pengaman penerangan lantai 1 dan 2 yang digunakan pada
    fasa R, S, T adalah MCB 1 fase 6 A. Pada kapasitas pengaman AC lantai 1 dan 2
    yang digunakan adalah MCB 1 fase 16 A. Hasil penghitungan pengaman Sub
    Distribution Panel pada penerangan lantai 1 dan 2 menggunakan MCB 3 fase 6 A
    juga pada AC menggunakan MCB 3 fase 16 A. Pada kapasitas pengaman utama
    hasil penghitungan menggunakan MCCB 3 fase 25 A. Untuk hasil penghitungan
    penghantar yang digunakan pada tiap grup penerangan lantai 1 dan 2 yaitu kabel
    NYA 1,5 mm2, Hasil penghitungan pada penghantar Sub Distribution Panel
    menggunakan kabel NYY 2,5 mm2 juga pada penghantar utama menggunakan
    kabel NYY 4 mm2.
    Kata kunci : instalasi penerangan, penghantar, pengaman, titik lampu.
    ABSTRACT
    Muhammad Raihan Devgan Tamiana Supervisor
    19612009 I. Ir. H. M. Syahrir Djalil, M.T.
    Studi Program D-III Electrical Engineering II. H. Abdul Rahman, LC., M.Fil.l.
    STUDY OF ELECTRICAL INSTALLATION OFFICE OF THE STATE
    CONFISCATED OBJECTS STORAGE HOUSE CITY OF SAMARINDA
    Until now there are still many shortcomings in paying attention to accuracy in the
    installation of lighting installations, one of which is at the RUPBASAN Office. The
    General Meeting of Shareholders has several missions, one of which is storing
    objects confiscated by the state so that they are guaranteed good and safe,
    providing good and comfortable service to guests or employees who work in it, and
    thus the need for good electrical installations is important to support smooth
    operation. activities carried out in the general meeting office. This building is
    located at Jalan P. Suryanata No. 17, Bukit Pinang, Samarinda Ulu District,
    Samarinda City, East Kalimantan. For field data, the total number of light points
    is 88 light points, while the results of the calculation of the total number of light
    points are 131 light points. So the difference in the number of light points based on
    the results of the comparison is 43 light points. The results of the calculation of the
    overall power at the general meeting office of 11637 watts, while the overall power
    installed in the field is 10723 watts. The results of the calculation of the safety
    capacity of the 1st and 2nd-floor lighting used in the R, S, and T phases are MCB
    1 phase 6 A. On the 1st and 2nd floors, the AC safety capacity used is MCB 1 phase
    16 A. The calculation results of the Sub Distribution Panel safety on lighting floors
    1 and 2 use MCB 3 phase 6 A as well as AC using MCB 3 phase 16 A. In the main
    safety capacity, the calculation results use MCCB 3 phase 25 A. For the calculation
    results, the conductors used in each group of floor lighting 1 and 2 are NYA cables
    1.5 mm2, the results of the calculation on the Sub Distribution Panel conductor
    using a 2.5 mm2 NYY cable as well as the main conductor using a 4 mm2 NYY cable.
    Keywords: lighting installation, conductor, safety, light points.