    STUDI INSTALASI LISTRIK GEDUNG BADAN PENDAPATAN DAERAH PROVINSI KALIMANTANTIMUR --

    Virditha Septira Pratiwi / / /
    Samarinda 2021
    v; 105 h; ilus; 23 cm Bahasa:Ind

    ABSTRACT
    Virditha Septira Pratiwi Supervisor :
    18612038 i. Hj. Verra Aullia, S. T., M.T
    D III Electrical Engineering Study Program ii. Drs. La Bima, M. Si
    STUDY OF ELECTRICITY INSTALLATION BUILDING REGIONAL REVENUE AGENCY OF EAST KALIMANTAN PROVINCE
    Abstract,This study was conducted in order to find out a good electrical installation system in accordance with the standards of the electrical installation system, it must be obtained by metode the number of light points, determining conductors, determining safety, and making power recapitulation. In the process of calculating and determining the number of light points for the office space and in other rooms that have the same size, as a representative with a room length of 10 m and a width of 5 m, the calculation results for determining the number of lamps are 10 armatures with a TL specification of 2x25 Watt with a safety MCB 10 A and the cundoctor used 2,5 mm2, then for the totally of power from the 1st floor, 2 floor, 3 floor,4 floor, and 5 floor is 91686 Watt.
    Keywords :electrical installation, conductor, power recapitylation, light point.