    STUDI SISTEM PENGOPERASIAN DAN PEMELIHARAAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) DAN PEMBANGKIT LISTRIK TENAGA DIESEL (PLTD) DI PULAU MALAHING KOTA BONTANG --

    Iqbal Zulfikar / / /
    Samarinda 2021
    v; 105 h; ilus; 23 cm Bahasa:Ind

    ABSTRACT
    Iqbal Zulfikar Supervisor :
    18612004 I. Suratno, S.T., M.T
    D-III Electrical Engineering Study Program II. Ir. Rusda, S.T., M.T., IPM
    Study on the Operation and Maintenance System of Solar Power Plants and Diesel Power Plants on Malahing Island, Bontang City
    Abstract, The electricity needs on Malahing Island, Bontang City have been fulfilled by the presence of electrical energy sources from solar energy power plants and diesel power plants. This study discusses the operation and maintenance of solar power plants and diesel power plants located on Malahing Island and parts of solar power plants and diesel power plants related to electricity problems. From the results of the study obtained; solar power generation capacity of 15 kWp and diesel power generation capacity of 10 kW. The load that will be supplied by electrical energy sources is 43 houses with each house limited to 400 Watts of power and 37 public street lighting using 10 Watt LED lights and other public facilities such as mosques, toilets and public meeting halls. The people of Malahing Island are supplied with solar power plants in the morning until the afternoon because the batteries can no longer store energy so that diesel power plants are used as a backup energy source to be used in the afternoon until the evening.
    Keywords: Solar Power Plant, Diesel Power Plant, Malahing Island